Download Starting System (Section STR)
Manual Description(SRS) "AIR BAG" and "SEAT BELT PRE-TENSIONER" 2, : Component Parts Location 4, : Component Parts Location 5, precaution for Supplemental Restraint System (SRS) "AIR BAG" "SEAT BELT.
The Supplemental Restraint System such as AIR BAG” and SEAT BELT PRE-TENSIONER”, used along, with a front seat belt, helps to reduce the risk or severity of injury to the driver and front passenger certain, to avoid rendering the SRS inoperative, which could increase the risk of personal injury death, the event of a collision which would result in air bag inflation, all maintenance must be performed by.
Improper maintenance, including incorrect removal and installation of the SRS, can lead personal, injury caused by unintentional activation of the system, pRECAUTIONS WHEN USING POWER TOOLS (AIR OR ELECTRIC) AND HAMMERS, when working near the Airbag Diagnosis Sensor Unit or other Airbag System sensors with the Ignition ON or engine running, DO NOT use air or electric power tools or strike near sensor(s) with.
When using air or electric power tools or hammers, always switch the Ignition OFF, disconnect, battery and wait at least 3 minutes before performing any service, the actual shapes of Kent-Moore tools may differ from those of special service tools illustrated here, tests batteries, starting charging systems.
For operating instructions, refer diagnostic, bCM (view with combination meter removed), transmission range switch supplies power to starter relay, starter control relay inside the IPDM E/R when shift selector.
BCM controls the starter relay inside IPDM E/R, cPU inside IPDM E/R operates the starter relay when ignition, the starter motor plunger closes and the motor supplied with, battery power, which in turn cranks the engine, when the S terminal is supplied with electric power.
The starter motor plunger closes and provides a closed circuit between the battery and starter motor, starter motor is grounded to the cylinder block, cPU inside IPDM E/R controls starter control relay, battery power, which in turn cranks the engine, when the S” terminal is supplied with electric power.
STARTING SYSTEM DIAGNOSIS WITH GR8-1200 NI, to test the starting system, use the following special service tool, nI Multitasking battery electrical diagnostic station, refer to the diagnostic station Instruction Manual for proper starting system diagnosis procedures.
To ensure a complete and thorough diagnosis, the battery, starter motor and generator test segments must be, done as a set start finish, perform the starting system test with Multitasking battery and electrical diagnostic station GR8-1200 NI, details and operating instructions, refer to diagnostic station Instruction Manual.
CHARGE BATTERY>>Perform the slow battery charging procedure, rEPLACE BATTERY>>Before replacing battery, clean the battery cable clamps battery posts, check that the starter motor operates properly, >> Perform further diagnosis of engine mechanical or engine control system.
Check that starter motor operates, yES >> Check ring gear and starter motor drive pinion, compare the engine coolant temperature and verify the cranking voltage within specifications, minimum Specification of Cranking Voltage Referencing Coolant Temperature.
More than (More than 34), is the voltage less than specified value, does the starter motor turn smoothly, check that the engine can be rotated by hand.
Does the engine turn freely by hand, >> Perform further diagnosis of engine mechanical or powertrain mechanism, refer to the diagnostic station Instruction Manual proper testing procedures, if any malfunction is found, immediately disconnect the battery cable negative terminal.
Crank the engine and check that engine starts, check that the starter motor stops after starting engine, check that the engine turns when cranking.